Monday, June 11, 2012

The Lectern Dry Fit

 It's always a good time when the pieces come together and the project comes to life. 


The internal frame of the lectern top is complete. The joinery (all done by hand) is formed by interlocking half-laps and rebate. The angles sat at 15 and 30 degrees made for a bit of fun. 


The design at this point again becomes complicated. A series of holes need to be drilled for the adjustable height mechanism and to tunnel the wiring. Final decisions need to be made in relation to the location and size of the holes. This is not a step to be rushed.


(And I really need to clean up my bench.)

No comments:

Post a Comment

Like at Facebook

Redbubble