The casework on the Wax Melter is complete. The glass is installed in the top panel (hinges pending.) A back door was cut, laminated and hinged. Two lips (on the glass panel & the the lower door) to keep water from running into the doors. I just need to fine tune the hinges and attach a handle. The next upgrades are metal angle to hold various filters and to build a stand to keep it off the ground.a
A Retired Master Woodworker Reveals His Secret
ReplyDeleteAnnouncing The World's Largest Collection Of
16,000 Woodworking Plans
Detailed Step By Step Complete Plan Without Guesswork
From bill of materials, cutting lists, photos, 3D diagrams, etc
https://linktr.ee/16000woodworkingplansebook